Do not nail through overlaps.
Rough sawn cedar siding installation.
Allow a 1 8 inch expansion gap between pieces if the siding is air or kiln dried.
Channel rustic 1x10 cedar siding rough face cust select grade.
Available in tando solid color series and tando natural color series.
When butt jointing siding cut ends at 45 degree angles to form an overlapping joint.
The single course 90 long profile minimizes waste during installation especially around dormers and peaks.
Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.
This is particularly important for vertical installation.
Air or kiln dried siding that has been kept dry can be installed immediately.
The cedar siding is first acclimatized by storing on stickers.
Ordinary rough sawn boards are best installed as vertical siding which ensures that moisture will not collect on horizontal surfaces.
Tando roughsawn cedar single features random mill saw marks and a long subtle grain for a clean classic look with 6 inch exposure.
Lap siding can be installed horizontally or vertically.
Ensure joints meet on studs blocking or furring strips with the nail penetrating solid wood at least 1 1 4 inches.
Painted siding 1x10 channel rustic lap cedar.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board facing the street side of the house and overlapping the edge of the adjoining.
The boards were pre coated on all other sides before installation.
Painted siding 1x10 channel rustic lap cedar mill select factory prime paint barn red home in kentucky.
Moisture can however seep into joints where two vertical.
For the beleveld lap siding we used flood cwf on the rough side facing out.